|
The construction is a steel portal frame with insulated metal profile
roof and wall cladding. The offices and factory are separated by
a full height 215mm thick blockwork compartment wall. The external
walls of the offices are lined internally with blockwork and internal
partitions are blockwork. The offices are arranged on two floors,
constructed within the portal frame envelope. A lift is provided
to the offices.
Ancillary works included car parking, yard and services areas,
together with landscaping and planting.
|